Manufacturing
Can a plant retire its local scheduling tool?
A manufacturer standardizing on an ERP may discover that a plant still relies on a local scheduler to promise delivery. An enterprise rollout turns on the exceptions that tool handles on the floor.
What happens when the schedule changes?
In this illustrative case, a customer advances an order while a production line is down. The ERP holds the original promise date. A planner has revised it locally. Both records matter to the next shipment decision.
Explore the enterprise assessmentFollow one work order
With the plant’s permission, trace the order through planning, materials, production and shipping. Identify where a promise date is set, overridden and communicated to the customer.
Compare the two decisions
Use the same order in both scheduling paths. A side-by-side decision record shows where they agree and which constraints the central system misses.
Agree what the plant can switch
Operations decides which lines can use the common path, which exceptions still need a planner and what would trigger a return to the local schedule.